Bukit Panjang LRT Bombardier Innovia APM 100 (Batch 2)

RailTravel Station

The second batch of trains for the Bukit Panjang LRT consists of a fleet of 13 additional train cars to boost the capacity of the line by 50%. 4 of the new train cars are in operation, with all of them expected to operate by end-2015.

While the design of the exterior of the train is of a newer look, the mechanics are essentially almost the same.

The interior of the new train car.

A notable difference as compared to the original batch is the additional row of handgrips in the middle.

A builder plate found in the new car.

Priority seats are in a different colour in line with the enhancements made from the Downtown Line trains.

The route map on board also conforms to the newer design which integrate the station symbol and the station number together.

Most of the time, the train will operate in a 2-car…

View original post 15 more words

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: